Rossington Architecture

A burned out 2-unit building in the Mission District was rebuilt. Long before the fire gutted the building, it had been severely altered and stripped down. This rebuild restored the structure to its original splendor. The upper unit was expanded to include another floor of living space and terraces were added facing both east and west, helping to flood the unit with natural light.

 

construction: completed in 2018 by Spiteri Construction
structural engineer: SEMCO Engineering
photography: © 2019 Open Homes Photography Inc.
architect / design team: Phil Rossington, Mason St.Peter, Maryam Nassajian.

 

Awards and Publications:

Next project

Castilian, San Mateo